| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0262 #01 Y:2002 | 01 | 2002 | Insulate bare equipment | $1,233 | $659 | |
| UU0041 #06 Y:2002 | 06 | 2002 | Utilize daylight whenever possible in lieu of artificial light | $748 | - | n/a |
| UU0041 #05 Y:2002 | 05 | 2002 | Reschedule plant operations or reduce load to avoid peaks | $14,860 | - | n/a |
| UU0041 #04 Y:2002 | 04 | 2002 | Optimize plant power factor | $31,340 | $45,900 | n/a |
| UU0041 #03 Y:2002 | 03 | 2002 | Insulate bare equipment | $1,080 | $950 | n/a |
| UU0041 #02 Y:2002 | 02 | 2002 | Use waste heat from hot flue gases to preheat | $1,207 | $3,500 | n/a |
| UU0041 #01 Y:2002 | 01 | 2002 | Analyze flue gas for proper air/fuel ratio | $9,352 | $2,000 | n/a |
| TA0050 #10 Y:2002 | 10 | 2002 | Reduce illumination to minimum necessary levels | $390 | - | |
| TA0050 #09 Y:2002 | 09 | 2002 | Reduce illumination to minimum necessary levels | $390 | - | |
| TA0050 #08 Y:2002 | 08 | 2002 | Turn off equipment when not in use | $1,676 | - | |
| TA0050 #07 Y:2002 | 07 | 2002 | Reduce the pressure of compressed air to the minimum required | $2,570 | - | |
| TA0050 #06 Y:2002 | 06 | 2002 | Change procedures / equipment / operating conditions | $4,492 | - | |
| TA0050 #05 Y:2002 | 05 | 2002 | Upgrade obsolete equipment | $5,795 | $11,200 | |
| TA0050 #04 Y:2002 | 04 | 2002 | Modify process to reduce material use/cost | $13,150 | - | |
| TA0050 #03 Y:2002 | 03 | 2002 | Use adjustable frequency drive or multiple speed motors on existing system | $6,258 | $8,100 | |
| TA0050 #02 Y:2002 | 02 | 2002 | Re-use or recycle hot or cold process exhaust air | $47,100 | $5,202 | |
| TA0050 #01 Y:2002 | 01 | 2002 | Upgrade conveyors | $430,950 | $202,900 | |
| NC0254 #10 Y:2002 | 10 | 2002 | Improve space comfort conditioning | $175,198 | $307,000 | |
| NC0254 #09 Y:2002 | 09 | 2002 | Use waste heat from hot flue gases to generate steam | $88,312 | $160,000 | |
| NC0254 #08 Y:2002 | 08 | 2002 | Utilize higher efficiency lamps and/or ballasts | $4,127 | $24,350 |