ITAC Assessment: NC0254
ITAC logo
ITAC Assessment: NC0254
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Cast iron parts for auto industry
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $50
M
to 100
M
# of Employees 688
Plant Area 440,000
ft2
Annual Production 188,772,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,015,709 64,407,700
kWh
Electricity Demand $1,109,389 133,020
kW-mo/yr
Electricity Fees $54,957 -
Natural Gas $1,182,581 164,766
MMBtu
Coal $1,288,406 298,884
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,366,596 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,433,107

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Coal Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
01 4.123: Reduce defects by reducing product tipping $639,636 $10,000 n/a - - - - - - - - $639,636
02 4.126: Install sensors to detect defects $85,500 $3,000 - - - - $85,500 - - - -
03 4.454: Modify startup/shutdown times $1,342,708 $10,000 $103,200
6,000,000
kWh
- $291,508
-
MMBtu
- $948,000 - - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $10,930 $20,000 $4,455
259,000
kWh
$6,475
-
kW-mo/yr
- - - - - - -
05 2.2514: Cover open tanks $14,740 - - - - $17,512
-
MMBtu
- - $(-2,772.0) - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $546 $1,000 $328
19,085
kWh
$218
-
kW-mo/yr
- - - - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,899 $500 $10,413
605,426
kWh
$7,206
-
kW-mo/yr
- - $(-6,720.0) $(-6,000.0) - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,127 $24,350 $826
48,000
kWh
$1,201
-
kW-mo/yr
- - - - - $2,100 -
09 2.2422: Use waste heat from hot flue gases to generate steam $88,312 $160,000 - - $90,312
-
MMBtu
- - $(-2,000.0) - - -
10 4.424: Improve space comfort conditioning $175,198 $307,000 $(-2,466.0)
(-143,333)
kWh
$(-3,586.0)
-
kW-mo/yr
- - $187,250 $(-6,000.0) - - -
TOTAL RECOMMENDED $2,366,596 $535,850 $116,756
6,788,178
kWh
$11,514
-
kW-mo/yr
$381,820
-
MMBtu
$17,512
-
MMBtu
$1,214,030 $(-14,000.0) $(-2,772.0) $2,100 $639,636
TOTAL IMPLEMENTED $1,433,107 $13,500 $113,613
6,605,426
kWh
$7,206
-
kW-mo/yr
$291,508
-
MMBtu
- $1,026,780 $(-6,000.0) - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Coal Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs