Assessment Year | 2022 |
---|---|
Principal Product | Animal Feed |
NAICS | 311119: Other Animal Food Manufacturing |
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $10 M to 50M |
# of Employees | 35 |
Plant Area |
55,000
ft2
|
Annual Production | 113,419
ton
|
Production Hrs. Annual | 5,800
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $123,065 | 1,890,113 |
kWh
|
$0.065 |
Electricity Demand | $48,422 | 5,124 |
kW-mo/yr
|
$9.45 |
Electricity Fees | $22,219 | - |
|
- |
Natural Gas | $145,456 | 25,439 |
MMBtu
|
$5.72 |
TOTAL YEARLY COSTS | $339,162 | |||
RECOMMENDED SAVINGS* | $46,440 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $13,680 | $22,600 | - | - | $13,680 | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $11,177 | $25,216 | - | - | - |
$11,177
-
MMBtu
|
|
03 | 2.8114: Change rate schedules or other changes in utility service | $5,645 | $2,000 | - | - | $5,645 | - | |
04 | 2.3212: Optimize plant power factor | $4,698 | $20,000 | - | - | $4,698 | - | |
05 | 2.2511: Insulate bare equipment | $3,620 | $7,340 | - | - | - |
$3,620
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,050 | $218 |
$2,544
39,070
kWh
|
$506
-
kW-mo/yr
|
- | - | |
07 | 2.7135: Install occupancy sensors | $1,910 | $3,500 |
$1,910
29,330
kWh
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,777 | $3,908 |
$1,369
21,031
kWh
|
$408
-
kW-mo/yr
|
- | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $883 | $1,000 |
$713
10,950
kWh
|
$170
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $46,440 | $85,782 |
$6,536
100,381
kWh
|
$1,084
-
kW-mo/yr
|
$24,023 |
$14,797
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs