ITAC Assessment: MA0840
ITAC logo
ITAC Assessment: MA0840
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Contact lens blanks
NAICS 339115: Ophthalmic Goods Manufacturing
SIC 3851: Ophthalmic Goods
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area 33,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 4,271
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,029 1,154,060
kWh
Electricity Demand $28,185 3,394
kW-mo/yr
Electricity Fees $198 -
Natural Gas $26,013 2,231
MMBtu
Waste Disposal Costs
Water Usage $1,441 99
Tgal
Water Disposal $1,441 99
Tgal
TOTAL YEARLY COSTS $182,307
RECOMMENDED SAVINGS* $37,548 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,815

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $21,194 $381,355 $17,806
164,874
kWh
$3,388
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,849 $2,575 $1,946
18,018
kWh
$6,903
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $2,180 $699 - - $2,180
-
MMBtu
-
04 2.7224: Reduce space conditioning during non-working hours $1,247 $2,731 $69
635
kWh
- $1,178
-
MMBtu
-
05 2.8121: Apply for tax-free status for energy purchases $1,635 $1,000 - - - $1,635
06 2.2511: Insulate bare equipment $1,204 $706 $1,204
11,152
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,239 $3,220 $1,123
10,400
kWh
$116
-
kW-mo/yr
- -
TOTAL RECOMMENDED $37,548 $392,286 $22,148
205,079
kWh
$10,407
-
kW-mo/yr
$3,358
-
MMBtu
$1,635
TOTAL IMPLEMENTED $3,815 $1,699 - - $2,180
-
MMBtu
$1,635
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs