Assessment Year | 2003 |
---|---|
Principal Product | cable and wire |
NAICS | 311520: Ice Cream and Frozen Dessert Manufacturing |
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $10 M to 50M |
# of Employees | 190 |
Plant Area |
75,000
ft2
|
Annual Production | 100,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $428,947 | 15,464,800 |
kWh
|
$0.028 |
Electricity Demand | $284,180 | 384,192 |
kW-mo/yr
|
$0.74 |
Natural Gas | $74,597 | 17,019 |
MMBtu
|
$4.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $58,587 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,352 | $2,000 | n/a | - | - |
$9,352
-
MMBtu
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $1,207 | $3,500 | n/a | - | - |
$1,207
-
MMBtu
|
03 | 2.2511: Insulate bare equipment | $1,080 | $950 | n/a | - | - |
$1,080
-
MMBtu
|
04 | 2.3212: Optimize plant power factor | $31,340 | $45,900 | n/a | - |
$31,340
-
kW-mo/yr
|
- |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $14,860 | - | n/a | - |
$14,860
-
kW-mo/yr
|
- |
06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $748 | - | n/a |
$398
13,100
kWh
|
$350
-
kW-mo/yr
|
- |
TOTAL RECOMMENDED | $58,587 | $52,350 |
$398
13,100
kWh
|
$46,550
-
kW-mo/yr
|
$11,639
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs