| Assessment Year | 2003 |
|---|---|
| Principal Product | cable and wire |
| NAICS | 311520: Ice Cream and Frozen Dessert Manufacturing |
| SIC | 3357: Drawing and Insulating of Nonferrous Wire |
| Sales Range | $10 M to 50M |
| # of Employees | 190 |
| Plant Area |
75,000
ft2
|
| Annual Production | 100,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $428,947 | 15,464,800 |
kWh
|
$0.028 |
| Electricity Demand | $284,180 | 384,192 |
kW-mo/yr
|
$0.74 |
| Natural Gas | $74,597 | 17,019 |
MMBtu
|
$4.38 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $58,587 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,352 | $2,000 | n/a | - | - |
$9,352
-
MMBtu
|
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $1,207 | $3,500 | n/a | - | - |
$1,207
-
MMBtu
|
| 03 | 2.2511: Insulate bare equipment | $1,080 | $950 | n/a | - | - |
$1,080
-
MMBtu
|
| 04 | 2.3212: Optimize plant power factor | $31,340 | $45,900 | n/a | - |
$31,340
-
kW-mo/yr
|
- |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $14,860 | - | n/a | - |
$14,860
-
kW-mo/yr
|
- |
| 06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $748 | - | n/a |
$398
13,100
kWh
|
$350
-
kW-mo/yr
|
- |
| TOTAL RECOMMENDED | $58,587 | $52,350 |
$398
13,100
kWh
|
$46,550
-
kW-mo/yr
|
$11,639
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs