ITAC Assessment: UF0267
ITAC logo
ITAC Assessment: UF0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Newspaper Printing
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 290
Plant Area 100,000
ft2
Annual Production 60,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,246 3,855,693
kWh
Electricity Demand $58,662 8,091
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $240,906 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,774

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.7141: Lower light fixtures in high ceiling areas $2,310 $7,321 $2,380
35,995
kWh
- - $(-70.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $674 $737 $552
12,264
kWh
$122
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $6,321 $3,892 $6,321
140,466
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $828 $1,200 - $48
-
kW-mo/yr
$217 $563
05 2.8121: Apply for tax-free status for energy purchases $28,774 $50 - - - $28,774
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,346 $530 $2,452
35,031
kWh
- - $(-106.0)
07 2.2515: Use optimum thickness insulation $1,022 $933 $1,022
14,596
kWh
- - -
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $323 $1,895 - - - $323
09 3.5316: Contract a wood pallet recycling company $2,400 - - - - $2,400
10 4.231: Purchase equipment instead of leasing $192,931 - - - - $192,931
11 4.431: Train operators for maximum operating efficiency $2,977 $800 - - - $2,977
TOTAL RECOMMENDED $240,906 $17,358 $12,727
238,352
kWh
$170
-
kW-mo/yr
$217 $227,792
TOTAL IMPLEMENTED $28,774 $50 - - - $28,774
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs