ITAC Assessment: UD0628
ITAC logo
ITAC Assessment: UD0628
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Blow molded plastic parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 118,500
ft2
Annual Production 6,240,000
pieces
Production Hrs. Annual 5,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $216,691 6,566,400
kWh
Electricity Demand $108,930 15,048
kW-mo/yr
Natural Gas $24,342 2,112
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $122,715 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,147

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 3.5315: Lease / purchase baler; sell cardboard to recycler $35,895 $7,000 - - - $19,320
-
lb
$16,575
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,711 $55,200 $14,307
433,541
kWh
$5,404
-
kW-mo/yr
- - -
03 2.3212: Optimize plant power factor $17,969 $9,000 - $17,969
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,246 $15,500 $10,216
309,857
kWh
$5,030
-
kW-mo/yr
- - -
05 2.2511: Insulate bare equipment $11,223 $7,600 $7,464
226,195
kWh
$3,759
-
kW-mo/yr
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,414 $33,000 $6,107
185,069
kWh
$2,307
-
kW-mo/yr
- - -
07 2.8114: Change rate schedules or other changes in utility service $4,858 - - - $4,858
-
MMBtu
- -
08 2.2437: Recover waste heat from equipment $4,827 $4,000 - - $4,827
-
MMBtu
- -
09 2.4322: Use or replace with energy efficient substitutes $4,097 $3,200 $2,623
79,488
kWh
$1,474
-
kW-mo/yr
- - -
10 2.4221: Install compressor air intakes in coolest locations $475 - $304
9,216
kWh
$171
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $122,715 $134,500 $41,021
1,243,366
kWh
$36,114
-
kW-mo/yr
$9,685
-
MMBtu
$19,320
-
lb
$16,575
TOTAL IMPLEMENTED $38,147 $19,800 $10,087
305,683
kWh
$23,202
-
kW-mo/yr
$4,858
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs