Assessment Year | 2024 |
---|---|
Principal Product | Custom sheet metal products |
NAICS | 332322: Sheet Metal Work Manufacturing |
SIC | 3444: Sheet Metal Work |
Sales Range | $5 M to 10M |
# of Employees | 18 |
Plant Area |
24,000
ft2
|
Annual Production | 1,400
units
|
Production Hrs. Annual | 2,730
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $11,032 | 257,384 |
kWh
|
$0.043 |
Electricity Demand | $34,000 | 1,572 |
kW-mo/yr
|
$21.63 |
Electricity Fees | $8,867 | - |
|
- |
Natural Gas | $6,308 | 615 |
MMBtu
|
$10.26 |
TOTAL YEARLY COSTS | $60,206 | |||
RECOMMENDED SAVINGS* | $40,498 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $12,561 | $150,694 |
$6,848
159,762
kWh
|
$5,713
-
kW-mo/yr
|
- | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $23,469 | $472,800 |
$6,178
144,136
kWh
|
$15,472
-
kW-mo/yr
|
- | $1,820 | |
03 | 2.2622: Replace existing chiller with high efficiency model | $1,212 | $5,526 |
$302
7,038
kWh
|
$910
-
kW-mo/yr
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $223 | $2,035 |
$223
5,186
kWh
|
- | - | - | |
05 | 2.7444: Close holes and openings in building such as broken windows | $2,886 | $3,371 |
$77
1,803
kWh
|
- |
$2,809
-
MMBtu
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $148 | $250 |
$40
935
kWh
|
$108
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $40,498 | $634,676 |
$13,667
318,859
kWh
|
$22,203
-
kW-mo/yr
|
$2,809
-
MMBtu
|
$1,820 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs