Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,089

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL0151 #05 Y:1995 Contract a wood pallet recycling company $1,325 -
UL0151 #04 Y:1995 Lease / purchase baler; sell cardboard to recycler $3,275 -
UL0151 #03 Y:1995 Recover and reuse waste material $517,500 $1,800
UL0151 #02 Y:1995 Reduce the pressure of compressed air to the minimum required $692 $20
UL0151 #01 Y:1995 Use most efficient type of electric motors $297 $2,900
UL0150 #06 Y:1995 Contract a wood pallet recycling company $1,525 -
UL0150 #05 Y:1995 Lease / purchase baler; sell cardboard to recycler $2,825 -
UL0150 #04 Y:1995 Recover and reuse waste material $175,000 $1,800
UL0150 #03 Y:1995 Use most efficient type of electric motors $2,555 $4,500
UL0150 #02 Y:1995 Utilize higher efficiency lamps and/or ballasts $964 $921
UL0150 #01 Y:1995 Analyze flue gas for proper air/fuel ratio $27,420 $2,000
UF0141 #06 Y:1995 Use less wasteful packaging $1,990 $4,000
UF0141 #05 Y:1995 Use synthetic lubricant $945 $250
UF0141 #04 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $2,365 $750
UF0141 #03 Y:1995 Replace existing hvac unit with high efficiency model $18,184 $13,550
UF0141 #02 Y:1995 Use most efficient type of electric motors $2,249 $2,934
UF0141 #01 Y:1995 Utilize higher efficiency lamps and/or ballasts $10,578 $22,632
MS0051 #05 Y:1995 Install equipment (eg compactor) to reduce disposal costs $6,048 $20,000
MS0051 #04 Y:1995 Use re-usable filters $900 $1,500
MS0051 #03 Y:1995 Use water on air conditioning exchanger to improve heat transfer and increase air conditioner efficiency $1,724 $7,665