Assessment Year | 1996 |
---|---|
Principal Product | control valves |
NAICS |
n/a
|
SIC | 3491: Industrial Valves |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
70,000
ft2
|
Annual Production | 400,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $102,005 | 2,068,875 |
kWh
|
$0.049 |
Electricity Demand | $16,100 | 5,651 |
kW-mo/yr
|
$2.85 |
Electricity Fees | $28,693 | - |
|
- |
Natural Gas | $7,214 | 1,521 |
MMBtu
|
$4.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,008 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,762 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,762 | $4,217 |
$1,214
27,550
kWh
|
$251
-
kW-mo/yr
|
$297 | - | - | - | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,574 | $39,728 |
$9,658
220,106
kWh
|
$2,648
-
kW-mo/yr
|
$2,678 |
$(-4,410.0)
-
MMBtu
|
- | - | - | |
03 | 2.7227: Use water on air conditioning exchanger to improve heat transfer and increase air conditioner efficiency | $1,724 | $7,665 |
$1,826
41,618
kWh
|
$48
-
kW-mo/yr
|
$189 | - |
$(-339.0)
-
gal
|
- | - | |
04 | 3.7196: Use re-usable filters | $900 | $1,500 | - | - | - | - | - | - | $900 | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $6,048 | $20,000 | - | - | - |
$(-287.0)
-
MMBtu
|
- |
$6,335
-
gal
|
- | |
TOTAL RECOMMENDED | $21,008 | $73,110 |
$12,698
289,274
kWh
|
$2,947
-
kW-mo/yr
|
$3,164 |
$(-4,697.0)
-
MMBtu
|
$(-339.0)
-
gal
|
$6,335
-
gal
|
$900 | ||
TOTAL IMPLEMENTED | $1,762 | $4,217 |
$1,214
27,550
kWh
|
$251
-
kW-mo/yr
|
$297 | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs