| Assessment Year | 1995 |
|---|---|
| Principal Product | Drive Bits |
| NAICS |
n/a
|
| SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 55 |
| Plant Area |
26,750
ft2
|
| Annual Production | 1,100,000
pieces
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $120,388 | 1,244,725 |
kWh
|
$0.097 |
| Natural Gas | $16,447 | 2,959 |
MMBtu
|
$5.56 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $34,053 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,324 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,969 | $20,628 |
$10,969
126,612
kWh
|
- | |
| 02 | 2.7231: Use radiant heater for spot heating | $2,093 | $6,583 | - |
$2,093
-
MMBtu
|
|
| 03 | 2.4133: Use most efficient type of electric motors | $7,539 | $8,245 |
$7,539
75,909
kWh
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,024 | - |
$3,024
29,894
kWh
|
- | |
| 05 | 2.4226: Use / purchase optimum sized compressor | $7,891 | $10,900 |
$7,891
94,080
kWh
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $667 | $500 |
$667
4,982
kWh
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,123 | $260 |
$1,123
13,482
kWh
|
- | |
| 08 | 2.7226: Use computer programs to optimize hvac performance | $747 | $480 |
$747
9,086
kWh
|
- | |
| TOTAL RECOMMENDED | $34,053 | $47,596 |
$31,960
354,045
kWh
|
$2,093
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $20,324 | $19,885 |
$20,324
222,451
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs