ITAC Assessment: AS0139
ITAC logo
ITAC Assessment: AS0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Drive Bits
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 26,750
ft2
Annual Production 1,100,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,388 1,244,725
kWh
Natural Gas $16,447 2,959
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,053 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,324

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,969 $20,628 $10,969
126,612
kWh
-
02 2.7231: Use radiant heater for spot heating $2,093 $6,583 - $2,093
-
MMBtu
03 2.4133: Use most efficient type of electric motors $7,539 $8,245 $7,539
75,909
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,024 - $3,024
29,894
kWh
-
05 2.4226: Use / purchase optimum sized compressor $7,891 $10,900 $7,891
94,080
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $667 $500 $667
4,982
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,123 $260 $1,123
13,482
kWh
-
08 2.7226: Use computer programs to optimize hvac performance $747 $480 $747
9,086
kWh
-
TOTAL RECOMMENDED $34,053 $47,596 $31,960
354,045
kWh
$2,093
-
MMBtu
TOTAL IMPLEMENTED $20,324 $19,885 $20,324
222,451
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs