5,667
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NV0018 #02 Y:1994 | 02 | 1994 | Utilize higher efficiency lamps and/or ballasts | $194 | $186 | |
| NV0018 #01 Y:1994 | 01 | 1994 | Use most efficient type of electric motors | $3,017 | - | |
| KG0018 #05 Y:1994 | 05 | 1994 | Reduce the pressure of compressed air to the minimum required | $89 | $15 | |
| KG0018 #04 Y:1994 | 04 | 1994 | Install occupancy sensors | $307 | $195 | |
| KG0018 #03 Y:1994 | 03 | 1994 | Lower temperature during the winter season and vice-versa | $370 | - | |
| KG0018 #02 Y:1994 | 02 | 1994 | Utilize controls to operate equipment only when needed | $1,356 | $450 | |
| KG0018 #01 Y:1994 | 01 | 1994 | Utilize higher efficiency lamps and/or ballasts | $1,874 | $699 | |
| WV0054 #07 Y:1994 | 07 | 1994 | Reduce scrap production | $244,471 | $36,720 | |
| WV0054 #06 Y:1994 | 06 | 1994 | Maintain air filters by cleaning or replacement | $23,617 | $15,458 | |
| WV0054 #05 Y:1994 | 05 | 1994 | Use synthetic lubricant | $988 | - | |
| WV0054 #04 Y:1994 | 04 | 1994 | Analyze flue gas for proper air/fuel ratio | $10,787 | $1,000 | |
| WV0054 #03 Y:1994 | 03 | 1994 | Recover waste heat from equipment | $2,306 | $690 | |
| WV0054 #02 Y:1994 | 02 | 1994 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,161 | $500 | |
| WV0054 #01 Y:1994 | 01 | 1994 | Utilize energy-efficient belts and other improved mechanisms | $1,021 | - | |
| UL0119 #02 Y:1994 | 02 | 1994 | Utilize higher efficiency lamps and/or ballasts | $477 | $529 | |
| UL0119 #01 Y:1994 | 01 | 1994 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,280 | $40 | |
| SF0050 #09 Y:1994 | 09 | 1994 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $478,218 | $653,645 | |
| SF0050 #08 Y:1994 | 08 | 1994 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,930 | $900 | |
| SF0050 #07 Y:1994 | 07 | 1994 | Use heat from boiler blowdown to preheat boiler feed water | $4,773 | $25,000 | |
| SF0050 #06 Y:1994 | 06 | 1994 | Repair and eliminate steam leaks | $401 | $81 |