ITAC Assessment: UL0119
ITAC logo
ITAC Assessment: UL0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Tea Processing and Packaging
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 61
Plant Area 53,000
ft2
Annual Production 17,000,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,457 711,313
kWh
Natural Gas $7,610 1,742
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,757 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,757

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,280 $40 $1,280
24,326
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $477 $529 $477
9,086
kWh
TOTAL RECOMMENDED $1,757 $569 $1,757
33,412
kWh
TOTAL IMPLEMENTED $1,757 $569 $1,757
33,412
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs