Assessment Year | 2023 |
---|---|
Principal Product | medium voltage switchgear systems |
NAICS | 335313: Switchgear and Switchboard Apparatus Manufacturing |
SIC | 3613: Switchgear and Switchboard Apparatus |
Sales Range | $50 M to 100M |
# of Employees | 210 |
Plant Area |
115,443
ft2
|
Annual Production | 170
units
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $147,051 | 2,106,815 |
kWh
|
$0.070 |
Electricity Demand | $22,669 | 6,909 |
kW-mo/yr
|
$3.28 |
LPG | $114,416 | 6,605 |
MMBtu
|
$17.32 |
TOTAL YEARLY COSTS | $284,136 | |||
RECOMMENDED SAVINGS* | $172,527 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $172,197 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,895 | $9,731 |
$2,234
31,920
kWh
|
$324
-
kW-mo/yr
|
$2,337 | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $6,106 | $2,400 |
$5,966
85,223
kWh
|
$140
-
kW-mo/yr
|
- | |
03 | 2.7134: Use photocell controls | $314 | $100 |
$314
4,484
kWh
|
- | - | |
04 | 2.7135: Install occupancy sensors | $330 | $820 |
$330
4,709
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,882 | $6,873 |
$10,882
154,953
kWh
|
- | - | |
06 | 4.424: Improve space comfort conditioning | $150,000 | $75,650 | - | - | $150,000 | |
TOTAL RECOMMENDED | $172,527 | $95,574 |
$19,726
281,289
kWh
|
$464
-
kW-mo/yr
|
$152,337 | ||
TOTAL IMPLEMENTED | $172,197 | $94,754 |
$19,396
276,580
kWh
|
$464
-
kW-mo/yr
|
$152,337 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs