ITAC Assessment: MZ0337
ITAC logo
ITAC Assessment: MZ0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product medium voltage switchgear systems
NAICS 335313: Switchgear and Switchboard Apparatus Manufacturing
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 115,443
ft2
Annual Production 170
units
Production Hrs. Annual 4,680
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,051 2,106,815
kWh
Electricity Demand $22,669 6,909
kW-mo/yr
LPG $114,416 6,605
MMBtu
TOTAL YEARLY COSTS $284,136
RECOMMENDED SAVINGS* $172,527 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $172,197

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,895 $9,731 $2,234
31,920
kWh
$324
-
kW-mo/yr
$2,337
02 2.7221: Lower temperature during the winter season and vice-versa $6,106 $2,400 $5,966
85,223
kWh
$140
-
kW-mo/yr
-
03 2.7134: Use photocell controls $314 $100 $314
4,484
kWh
- -
04 2.7135: Install occupancy sensors $330 $820 $330
4,709
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,882 $6,873 $10,882
154,953
kWh
- -
06 4.424: Improve space comfort conditioning $150,000 $75,650 - - $150,000
TOTAL RECOMMENDED $172,527 $95,574 $19,726
281,289
kWh
$464
-
kW-mo/yr
$152,337
TOTAL IMPLEMENTED $172,197 $94,754 $19,396
276,580
kWh
$464
-
kW-mo/yr
$152,337
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs