ITAC Assessment: KU0322
ITAC logo
ITAC Assessment: KU0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ASPHALT MIXTURES
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area
n/a
Annual Production 10,000
Tgal
Production Hrs. Annual 7,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,286 516,120
kWh
Natural Gas $90,703 29,220
MMBtu
Fuel Oil #2 $43,905 5,642
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,261 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,202

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.1221: Replace obsolete burners with more efficient ones $9,059 $10,000 - $9,059
-
MMBtu
-
02 2.2136: Install / repair insulation on steam lines $16,055 $4,500 - - $16,055
-
MMBtu
03 2.7226: Use computer programs to optimize hvac performance $653 $250 $653
6,448
kWh
- -
04 2.6232: Install set-back timers $2,494 $900 $2,494
24,619
kWh
- -
TOTAL RECOMMENDED $28,261 $15,650 $3,147
31,067
kWh
$9,059
-
MMBtu
$16,055
-
MMBtu
TOTAL IMPLEMENTED $19,202 $5,650 $3,147
31,067
kWh
- $16,055
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs