ITAC Assessment: NV0018
ITAC logo
ITAC Assessment: NV0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Hydroseeding Mulch and Cellulose Insulation.
NAICS
n/a
SIC 2823: Cellulosic Manmade Fibers
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 7,000
ft2
Annual Production 15,000
ton
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,303 969,812
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,279 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,314

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $3,017 - $3,017
31,946
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $194 $186 $194
2,052
kWh
03 2.7135: Install occupancy sensors $228 $135 $228
2,345
kWh
04 2.7424: Shade windows from summer sun $103 $391 $103
1,172
kWh
05 2.3212: Optimize plant power factor $437 $5,010 $437
-
kWh
06 2.8114: Change rate schedules or other changes in utility service $10,300 - $10,300
-
kWh
TOTAL RECOMMENDED $14,279 $5,722 $14,279
37,515
kWh
TOTAL IMPLEMENTED $3,314 $577 $3,314
35,170
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs