| Assessment Year | 1987 |
|---|---|
| Principal Product | FABRICATED METAL PRODUCTS |
| NAICS |
n/a
|
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $1 M to 5M |
| # of Employees | 20 |
| Plant Area |
n/a
|
| Annual Production | 860,000
lb
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $23,778 | 240,035 |
kWh
|
$0.099 |
| Natural Gas | $3,561 | 618 |
MMBtu
|
$5.76 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $3,141 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,975 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $170 | $402 |
$170
1,758
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $166 | $425 |
$166
1,758
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $39 | $63 |
$39
293
kWh
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,306 | $200 |
$1,306
13,189
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,460 | $1,936 |
$1,240
12,603
kWh
|
$220 | |
| TOTAL RECOMMENDED | $3,141 | $3,026 |
$2,921
29,601
kWh
|
$220 | ||
| TOTAL IMPLEMENTED | $2,975 | $2,601 |
$2,755
27,843
kWh
|
$220 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs