ITAC Assessment: GT0322
ITAC logo
ITAC Assessment: GT0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product FABRICATED METAL PRODUCTS
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area
n/a
Annual Production 860,000
lb
Production Hrs. Annual 2,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,778 240,035
kWh
Natural Gas $3,561 618
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,141 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,975

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $170 $402 $170
1,758
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $166 $425 $166
1,758
kWh
-
03 2.4133: Use most efficient type of electric motors $39 $63 $39
293
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,306 $200 $1,306
13,189
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,460 $1,936 $1,240
12,603
kWh
$220
TOTAL RECOMMENDED $3,141 $3,026 $2,921
29,601
kWh
$220
TOTAL IMPLEMENTED $2,975 $2,601 $2,755
27,843
kWh
$220
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs