Assessment Year | 1995 |
---|---|
Principal Product | Corrugated Cartons |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $50 M to 100M |
# of Employees | 190 |
Plant Area |
435,600
ft2
|
Annual Production | 100,000
ton
|
Production Hrs. Annual | 7,238
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $765,297 | 8,568,582 |
kWh
|
$0.089 |
Natural Gas | $299,594 | 96,611 |
MMBtu
|
$3.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $565,986 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $56,203 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $48,642 | $166,900 |
$48,642
544,549
kWh
|
- | |
02 | 2.3212: Optimize plant power factor | $3,578 | $5,911 |
$3,578
-
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $2,230 | $1,125 |
$2,230
24,912
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,960 | $19,510 |
$21,960
245,897
kWh
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $1,254 | $748 | - |
$1,254
-
MMBtu
|
|
06 | 2.2135: Repair and eliminate steam leaks | $401 | $81 | - |
$401
-
MMBtu
|
|
07 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $4,773 | $25,000 | - |
$4,773
-
MMBtu
|
|
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,930 | $900 | - |
$4,930
-
MMBtu
|
|
09 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $478,218 | $653,645 |
$707,157
7,962,192
kWh
|
$(-228,939.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $565,986 | $873,820 |
$783,567
8,777,550
kWh
|
$(-217,581.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $56,203 | $169,006 |
$50,872
569,461
kWh
|
$5,331
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs