ITAC Assessment: SF0050
ITAC logo
ITAC Assessment: SF0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Corrugated Cartons
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 190
Plant Area 435,600
ft2
Annual Production 100,000
ton
Production Hrs. Annual 7,238
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $765,297 8,568,582
kWh
Natural Gas $299,594 96,611
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $565,986 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,203

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $48,642 $166,900 $48,642
544,549
kWh
-
02 2.3212: Optimize plant power factor $3,578 $5,911 $3,578
-
kWh
-
03 2.4133: Use most efficient type of electric motors $2,230 $1,125 $2,230
24,912
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,960 $19,510 $21,960
245,897
kWh
-
05 2.2136: Install / repair insulation on steam lines $1,254 $748 - $1,254
-
MMBtu
06 2.2135: Repair and eliminate steam leaks $401 $81 - $401
-
MMBtu
07 2.1243: Use heat from boiler blowdown to preheat boiler feed water $4,773 $25,000 - $4,773
-
MMBtu
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,930 $900 - $4,930
-
MMBtu
09 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $478,218 $653,645 $707,157
7,962,192
kWh
$(-228,939.0)
-
MMBtu
TOTAL RECOMMENDED $565,986 $873,820 $783,567
8,777,550
kWh
$(-217,581.0)
-
MMBtu
TOTAL IMPLEMENTED $56,203 $169,006 $50,872
569,461
kWh
$5,331
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs