ITAC Assessment: UM0034
ITAC logo
ITAC Assessment: UM0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Pressure Vessels
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 63
Plant Area 100,000
ft2
Annual Production 7,200
lb
Production Hrs. Annual 4,160
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,642 1,284,291
kWh
Natural Gas $41,669 9,530
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,209

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,536 $621 $1,536
16,413
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,759 $7,308 $1,759
20,223
kWh
-
03 2.6218: Turn off equipment when not in use $435 - $435
4,689
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,294 $150 $1,294
14,068
kWh
-
05 2.7441: Replace broken windows and/or window sash $2,450 $2,000 - $2,450
-
MMBtu
TOTAL RECOMMENDED $7,474 $10,079 $5,024
55,393
kWh
$2,450
-
MMBtu
TOTAL IMPLEMENTED $4,209 $9,308 $1,759
20,223
kWh
$2,450
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs