ITAC Assessment: OK0677
ITAC logo
ITAC Assessment: OK0677
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Coiled Steel Products
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 92
Plant Area 323,000
ft2
Annual Production 7,000
ton
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,611 1,710,033
kWh
Electricity Fees $25,385 -
Natural Gas $17,972 2,257
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,354 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,774

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.6232: Install set-back timers $1,275 $263 - - $1,275
-
MMBtu
- -
02 4.611: Begin a practice of predictive / preventative maintenance $4,300 - - - - $4,300 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,249 $631 $7,284
129,838
kWh
$3,229
-
kW-mo/yr
- $(-264.0) -
04 2.7135: Install occupancy sensors $112 $131 $112
1,997
kWh
- - - -
05 2.8121: Apply for tax-free status for energy purchases $4,838 $2,000 - - - - $4,838
06 2.4133: Use most efficient type of electric motors $2,275 $15,280 $2,274
40,535
kWh
- - - $1
07 2.7142: Utilize higher efficiency lamps and/or ballasts $996 $5,100 $821
14,627
kWh
$175
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $309 $505 $279
4,980
kWh
$30
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $24,354 $23,910 $10,770
191,977
kWh
$3,434
-
kW-mo/yr
$1,275
-
MMBtu
$4,036 $4,839
TOTAL IMPLEMENTED $20,774 $3,025 $7,396
131,835
kWh
$3,229
-
kW-mo/yr
$1,275
-
MMBtu
$4,036 $4,838
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs