ITAC Assessment: MA0235
ITAC logo
ITAC Assessment: MA0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SPECIALTY PAPER
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area
n/a
Annual Production 30,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,019,894 13,097,890
kWh
LPG $42,011 787,852
MMBtu
Fuel Oil #6 $732,531 266,587
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $124,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $94,715 $181,225 $(-43,495.0)
(-558,617)
kWh
$138,210
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,460 $14,275 $12,460
160,023
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $8,525 $24,600 - $8,525
-
MMBtu
04 2.2135: Repair and eliminate steam leaks $7,975 $165 - $7,975
-
MMBtu
05 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,141 $584 $1,141
14,654
kWh
-
TOTAL RECOMMENDED $124,816 $220,849 $(-29,894.0)
(-383,940)
kWh
$154,710
-
MMBtu
TOTAL IMPLEMENTED $16,500 $24,765 - $16,500
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs