Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Automotive Textiles
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $10
M
to 50
M
# of Employees 162
Plant Area 80,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 7,344
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,152 5,737,691
kWh
Natural Gas $116,099 17,617
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $285,351 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $285,351

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,021 - $1,021
33,998
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,161 $500 $2,161
71,805
kWh
- - -
03 2.2437: Recover waste heat from equipment $2,306 $690 - $2,306
-
MMBtu
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $10,787 $1,000 - $10,787
-
MMBtu
- -
05 2.4314: Use synthetic lubricant $988 - $988
32,825
kWh
- - -
06 2.6127: Maintain air filters by cleaning or replacement $23,617 $15,458 $2,542
84,408
kWh
$21,075
-
MMBtu
- -
07 3.1192: Reduce scrap production $244,471 $36,720 - $7,223
-
MMBtu
$224,855
-
lb
$12,393
TOTAL RECOMMENDED $285,351 $54,368 $6,712
223,036
kWh
$41,391
-
MMBtu
$224,855
-
lb
$12,393
TOTAL IMPLEMENTED $285,351 $54,368 $6,712
223,036
kWh
$41,391
-
MMBtu
$224,855
-
lb
$12,393
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs