Assessment Year | 2011 |
---|---|
Principal Product | Fluid Milk, Beverage, and Culture |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $100 M to 500M |
# of Employees | 180 |
Plant Area |
225,000
ft2
|
Annual Production | 484,547,724
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $518,082 | 13,978,805 |
kWh
|
$0.037 |
Electricity Demand | $331,232 | 2,248 |
kW-mo/yr
|
$147.35 |
Natural Gas | $580,330 | 69,572 |
MMBtu
|
$8.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $137,304 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,705 | $2,196 |
$903
22,700
kWh
|
$392
-
kW-mo/yr
|
- | - | $410 | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,796 | $36 |
$1,094
27,478
kWh
|
$702
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,689 | $7,000 |
$3,168
79,610
kWh
|
$1,521
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $37,847 | $32,000 | - | - |
$37,847
-
MMBtu
|
- | - | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $14,178 | $1,000 | - | - |
$14,178
-
MMBtu
|
- | - | - | |
06 | 2.2136: Install / repair insulation on steam lines | $1,960 | $1,140 | - | - |
$1,960
-
MMBtu
|
- | - | - | |
07 | 2.2696: Use excess cold process fluid for industrial cooling needs | $12,875 | $15,000 | - | - | - |
$7,357
-
Tgal
|
- |
$5,518
-
Tgal
|
|
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $30,572 | $99,100 |
$30,572
768,144
kWh
|
- | - | - | - | - | |
09 | 2.2437: Recover waste heat from equipment | $25,293 | $18,000 | - | - |
$25,293
-
MMBtu
|
- | - | - | |
10 | 2.2621: Modify refrigeration system to operate at a lower pressure | $6,389 | $10,000 |
$6,389
160,527
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $137,304 | $185,472 |
$42,126
1,058,459
kWh
|
$2,615
-
kW-mo/yr
|
$79,278
-
MMBtu
|
$7,357
-
Tgal
|
$410 |
$5,518
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs