ITAC Assessment: CO0656
ITAC logo
ITAC Assessment: CO0656
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Railroad products (frogs, switch points, turnouts)
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 99,000
ft2
Annual Production 396
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Wyoming

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,299 2,022,920
kWh
Electricity Demand $106,969 5,444
kW-mo/yr
Electricity Fees $588 -
Natural Gas $46,894 6,840
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,750

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,170 $630 $2,130
38,500
kWh
$2,040
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $24,770 $53,300 $14,170
262,600
kWh
$10,840
-
kW-mo/yr
- $130 - $(-370.0)
03 2.7491: Insulate glazing, walls, ceilings, and roofs $7,620 $62,400 - - $7,620
-
MMBtu
- - -
04 2.8121: Apply for tax-free status for energy purchases $7,530 $4,000 - - - - $7,530 -
05 2.7111: Reduce illumination to minimum necessary levels $2,280 $260 $1,140
21,800
kWh
$970
-
kW-mo/yr
- $170 - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,020 $6,960 $910
16,600
kWh
- - $60 - $50
TOTAL RECOMMENDED $47,390 $127,550 $18,350
339,500
kWh
$13,850
-
kW-mo/yr
$7,620
-
MMBtu
$360 $7,530 $(-320.0)
TOTAL IMPLEMENTED $38,750 $58,190 $17,440
322,900
kWh
$13,850
-
kW-mo/yr
- $300 $7,530 $(-370.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs