ITAC Assessment: SD0234
ITAC logo
ITAC Assessment: SD0234
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Medical devices for surgery
NAICS
n/a
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 315
Plant Area 57,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,125
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,449 1,091,149
kWh
Electricity Demand $34,940 2,405
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $189,154 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,069

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,609 $25,688 $13,552
171,161
kWh
$6,057
-
kW-mo/yr
- - -
02 2.7144: Install spectral reflectors / delamp $26,750 $21,265 $18,486
233,294
kWh
$8,264
-
kW-mo/yr
- - -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $6,768 $13,000 $4,458
56,272
kWh
$2,310
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,069 $1,425 $558
7,034
kWh
$511
-
kW-mo/yr
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,471 $7,825 $1,625
20,516
kWh
$846
-
kW-mo/yr
- - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,739 $3,334 $2,281
28,722
kWh
$2,511
-
kW-mo/yr
$(-1,053.0)
-
MMBtu
- -
07 2.4239: Eliminate or reduce compressed air usage $151 - $41
586
kWh
$110
-
kW-mo/yr
- - -
08 3.5212: Regrind, reuse, or sell scrap plastic parts $8,640 $510 - - - - $8,640
09 4.445: Install equipment to move product $119,957 $150,000 - - - $119,957 -
TOTAL RECOMMENDED $189,154 $223,047 $41,001
517,585
kWh
$20,609
-
kW-mo/yr
$(-1,053.0)
-
MMBtu
$119,957 $8,640
TOTAL IMPLEMENTED $1,069 $1,425 $558
7,034
kWh
$511
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs