2,847
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0574 #02 Y:2018 | 02 | 2018 | Install occupancy sensors | $14,108 | $10,162 | |
| WV0574 #01 Y:2018 | 01 | 2018 | Revise raw material specs | $26,910 | $52,500 | |
| TT0219 #09 Y:2018 | 09 | 2018 | Apply for investment incentives | $1,440 | - | |
| TT0219 #08 Y:2018 | 08 | 2018 | Clean or color roof to reduce solar load | $5,757 | $16,291 | |
| TT0219 #07 Y:2018 | 07 | 2018 | Utilize energy-efficient belts and other improved mechanisms | $2,725 | $12,000 | |
| TT0219 #06 Y:2018 | 06 | 2018 | Install vinyl strip / high speed / air curtain doors | $7,306 | $18,000 | |
| TT0219 #05 Y:2018 | 05 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $17,337 | $31,000 | |
| TT0219 #04 Y:2018 | 04 | 2018 | Turn off equipment when not in use | $18,588 | $10,000 | |
| TT0219 #03 Y:2018 | 03 | 2018 | Use optimum thickness insulation | $27,754 | $105,000 | |
| TT0219 #02 Y:2018 | 02 | 2018 | Reduce the pressure of compressed air to the minimum required | $50,161 | $360 | |
| TT0219 #01 Y:2018 | 01 | 2018 | Utilize higher efficiency lamps and/or ballasts | $53,170 | $61,967 | |
| UU0144 #04 Y:2018 | 04 | 2018 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,420 | $128 | |
| UU0144 #03 Y:2018 | 03 | 2018 | Optimize plant power factor | $6,190 | $6,000 | |
| UU0144 #02 Y:2018 | 02 | 2018 | Apply for tax-free status for energy purchases | $16,349 | $400 | |
| UU0144 #01 Y:2018 | 01 | 2018 | Insulate bare equipment | $42,296 | $1,068 | |
| OK1000 #07 Y:2018 | 07 | 2018 | Reduce the pressure of compressed air to the minimum required | $6,433 | - | |
| OK1000 #06 Y:2018 | 06 | 2018 | Upgrade controls on compressors | $19,605 | - | |
| OK1000 #05 Y:2018 | 05 | 2018 | Replace existing hvac unit with high efficiency model | $33,004 | $108,000 | |
| OK1000 #04 Y:2018 | 04 | 2018 | Clean and maintain refrigerant condensers and towers | $5,521 | $1,176 | |
| OK1000 #03 Y:2018 | 03 | 2018 | Utilize higher efficiency lamps and/or ballasts | $2,273 | $7,344 |