ITAC Assessment: TT0219
ITAC logo
ITAC Assessment: TT0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product elevators
NAICS 333921: Elevator and Moving Stairway Manufacturing
SIC 3534: Elevators and Moving Stairways
Sales Range $50
M
to 100
M
# of Employees 496
Plant Area 650,000
ft2
Annual Production 11,652
units
Production Hrs. Annual 5,824
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,765,333 23,784,918
kWh
Electricity Demand $684,243 57,192
kW-mo/yr
Natural Gas $700,935 111,957
MMBtu
Waste Disposal Costs
Water Usage $63,863 20,858
Tgal
Water Disposal $98,328 20,858
Tgal
TOTAL YEARLY COSTS $3,312,702
RECOMMENDED SAVINGS* $184,238 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $138,282

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $53,170 $61,967 $42,582
573,884
kWh
$1,292
-
kW-mo/yr
- $9,296 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $50,161 $360 $39,861
537,221
kWh
$10,300
-
kW-mo/yr
- - -
03 2.2515: Use optimum thickness insulation $27,754 $105,000 - - $27,754
-
MMBtu
- -
04 2.6218: Turn off equipment when not in use $18,588 $10,000 $18,588
250,506
kWh
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,337 $31,000 $12,076
162,752
kWh
$5,261
-
kW-mo/yr
- - -
06 2.7447: Install vinyl strip / high speed / air curtain doors $7,306 $18,000 $7,306
98,460
kWh
- - - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,725 $12,000 $2,725
36,731
kWh
- - - -
08 2.7425: Clean or color roof to reduce solar load $5,757 $16,291 $5,757
77,577
kWh
- - - -
09 4.812: Apply for investment incentives $1,440 - - - - - $1,440
TOTAL RECOMMENDED $184,238 $254,618 $128,895
1,737,131
kWh
$16,853
-
kW-mo/yr
$27,754
-
MMBtu
$9,296 $1,440
TOTAL IMPLEMENTED $138,282 $183,618 $88,200
1,188,682
kWh
$11,592
-
kW-mo/yr
$27,754
-
MMBtu
$9,296 $1,440
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings