ITAC Assessment: UU0144
ITAC logo
ITAC Assessment: UU0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Rotational Molding Fencing
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 6,624
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,755 2,964,031
kWh
Electricity Demand $117,092 7,020
kW-mo/yr
Electricity Fees $24,408 -
Natural Gas $263,007 69,058
MMBtu
TOTAL YEARLY COSTS $513,262
RECOMMENDED SAVINGS* $68,256 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,066

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $42,296 $1,068 - - - $42,296
-
MMBtu
02 2.8121: Apply for tax-free status for energy purchases $16,349 $400 - - $16,349 -
03 2.3212: Optimize plant power factor $6,190 $6,000 - - $6,190 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,420 $128 $1,880
51,114
kWh
$1,540
-
kW-mo/yr
- -
TOTAL RECOMMENDED $68,256 $7,596 $1,880
51,114
kWh
$1,540
-
kW-mo/yr
$22,539 $42,296
-
MMBtu
TOTAL IMPLEMENTED $62,066 $1,596 $1,880
51,114
kWh
$1,540
-
kW-mo/yr
$16,349 $42,296
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs