ITAC Assessment: LL0169
ITAC logo
ITAC Assessment: LL0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Steel Fabrication
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 250,000
ft2
Annual Production 12,000
ton
Production Hrs. Annual 3,640
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,096 2,482,836
kWh
Electricity Demand $76,871 9,070
kW-mo/yr
Electricity Fees $10,817 -
Natural Gas $49,202 5,843
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,444 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,889

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $31,185 $1,605 $13,960
480,730
kWh
$15,103
-
kW-mo/yr
$2,122 -
02 2.3137: Use power during off-peak periods $16,056 - - $14,962
-
kW-mo/yr
$1,094 -
03 2.7145: Install skylights $6,266 $4,116 $2,927
100,800
kWh
$2,913
-
kW-mo/yr
$426 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,298 $6,000 $4,938
170,034
kWh
- $360 -
05 4.611: Begin a practice of predictive / preventative maintenance $1,406 $159 - - - $1,406
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,233 $700 $397
13,666
kWh
- $29 $807
TOTAL RECOMMENDED $61,444 $12,580 $22,222
765,230
kWh
$32,978
-
kW-mo/yr
$4,031 $2,213
TOTAL IMPLEMENTED $37,889 $7,764 $18,898
650,764
kWh
$15,103
-
kW-mo/yr
$2,482 $1,406