Assessment Year | 2003 |
---|---|
Principal Product | Steel Fabrication |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
250,000
ft2
|
Annual Production | 12,000
ton
|
Production Hrs. Annual | 3,640
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $72,096 | 2,482,836 |
kWh
|
$0.029 |
Electricity Demand | $76,871 | 9,070 |
kW-mo/yr
|
$8.48 |
Electricity Fees | $10,817 | - |
|
- |
Natural Gas | $49,202 | 5,843 |
MMBtu
|
$8.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,444 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $37,889 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,185 | $1,605 |
$13,960
480,730
kWh
|
$15,103
-
kW-mo/yr
|
$2,122 | - | |
02 | 2.3137: Use power during off-peak periods | $16,056 | - | - |
$14,962
-
kW-mo/yr
|
$1,094 | - | |
03 | 2.7145: Install skylights | $6,266 | $4,116 |
$2,927
100,800
kWh
|
$2,913
-
kW-mo/yr
|
$426 | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,298 | $6,000 |
$4,938
170,034
kWh
|
- | $360 | - | |
05 | 4.611: Begin a practice of predictive / preventative maintenance | $1,406 | $159 | - | - | - | $1,406 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,233 | $700 |
$397
13,666
kWh
|
- | $29 | $807 | |
TOTAL RECOMMENDED | $61,444 | $12,580 |
$22,222
765,230
kWh
|
$32,978
-
kW-mo/yr
|
$4,031 | $2,213 | ||
TOTAL IMPLEMENTED | $37,889 | $7,764 |
$18,898
650,764
kWh
|
$15,103
-
kW-mo/yr
|
$2,482 | $1,406 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs