| Assessment Year | 2019 |
|---|---|
| Principal Product | Aero materials |
| NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 180 |
| Plant Area |
715,000
ft2
|
| Annual Production | 5,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $786,240 | 15,724,800 |
kWh
|
$0.050 | |
| Electricity Demand | $422,845 | 34,631 |
kW-mo/yr
|
$12.21 | |
| Natural Gas | $81,386 | 21,937 |
MMBtu
|
$3.71 | |
| Waste Disposal Costs | |||||
| Water Usage | $44,911 | 5,933 |
Tgal
|
$7.57 | |
| TOTAL YEARLY COSTS | $1,335,382 | ||||
| RECOMMENDED SAVINGS* | $103,433 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 4.132: Purchase new equipment to reduce material use / cost | $2,438 | $8,400 | - | - | $2,438 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $34,159 | $99,083 |
$24,738
494,754
kWh
|
$9,421
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,273 | $7,344 |
$2,273
45,461
kWh
|
- | - | |
| 04 | 2.7211: Clean and maintain refrigerant condensers and towers | $5,521 | $1,176 |
$3,274
65,481
kWh
|
$2,247
-
kW-mo/yr
|
- | |
| 05 | 2.7232: Replace existing hvac unit with high efficiency model | $33,004 | $108,000 |
$19,573
391,463
kWh
|
$13,431
-
kW-mo/yr
|
- | |
| 06 | 2.4224: Upgrade controls on compressors | $19,605 | - |
$19,605
392,098
kWh
|
- | - | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,433 | - |
$6,433
128,657
kWh
|
- | - | |
| TOTAL RECOMMENDED | $103,433 | $224,003 |
$75,896
1,517,914
kWh
|
$25,099
-
kW-mo/yr
|
$2,438 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs