ITAC Assessment: OK1000
ITAC logo
ITAC Assessment: OK1000
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Aero materials
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 715,000
ft2
Annual Production 5,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $786,240 15,724,800
kWh
Electricity Demand $422,845 34,631
kW-mo/yr
Natural Gas $81,386 21,937
MMBtu
Waste Disposal Costs
Water Usage $44,911 5,933
Tgal
TOTAL YEARLY COSTS $1,335,382
RECOMMENDED SAVINGS* $103,433 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 4.132: Purchase new equipment to reduce material use / cost $2,438 $8,400 - - $2,438
02 2.7142: Utilize higher efficiency lamps and/or ballasts $34,159 $99,083 $24,738
494,754
kWh
$9,421
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,273 $7,344 $2,273
45,461
kWh
- -
04 2.7211: Clean and maintain refrigerant condensers and towers $5,521 $1,176 $3,274
65,481
kWh
$2,247
-
kW-mo/yr
-
05 2.7232: Replace existing hvac unit with high efficiency model $33,004 $108,000 $19,573
391,463
kWh
$13,431
-
kW-mo/yr
-
06 2.4224: Upgrade controls on compressors $19,605 - $19,605
392,098
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $6,433 - $6,433
128,657
kWh
- -
TOTAL RECOMMENDED $103,433 $224,003 $75,896
1,517,914
kWh
$25,099
-
kW-mo/yr
$2,438
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs