ITAC Assessment: ND0247
ITAC logo
ITAC Assessment: ND0247
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Gypsum Wallboard
NAICS
n/a
SIC 3275: Gypsum Products
Sales Range $100
M
to 500
M
# of Employees 130
Plant Area 207,500
ft2
Annual Production 230,000
thousand feet
Production Hrs. Annual 8,424
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $435,725 12,417,644
kWh
Electricity Demand $206,547 20,942
kW-mo/yr
Electricity Fees $3,807 -
Natural Gas $1,276,944 560,745
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,051 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,677

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $182 $340 $125
2,052
kWh
$57
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $238 $400 $238
6,741
kWh
- - - -
03 2.6218: Turn off equipment when not in use $140 $840 $140
4,103
kWh
- - - -
04 2.7134: Use photocell controls $780 $600 $780
22,274
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $297 $243 $202
5,862
kWh
$95
-
kW-mo/yr
- - -
06 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $16,775 $12,966 - - - $16,775
-
MMBtu
-
07 2.8123: Pay utility bills on time $2,142 - - - $2,142 - -
08 3.1161: Eliminate/reduce an operation $1,497 $190 - - - - $1,497
-
lb
TOTAL RECOMMENDED $22,051 $15,579 $1,485
41,032
kWh
$152
-
kW-mo/yr
$2,142 $16,775
-
MMBtu
$1,497
-
lb
TOTAL IMPLEMENTED $2,677 $643 $440
12,603
kWh
$95
-
kW-mo/yr
$2,142 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs