Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,175

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0289 #03 Y:2003 Utilize higher efficiency lamps and/or ballasts $12,600 $4,857
WV0289 #02 Y:2003 Use excess cold process fluid for industrial cooling needs $16,901 $11,831
WV0289 #01 Y:2003 Replace existing chiller with high efficiency model $46,305 $117,949
SD0338 #05 Y:2003 Install automatic packing equipment $3,791 $3,500
SD0338 #04 Y:2003 Install equipment (eg compactor) to reduce disposal costs $18,690 $10,000
SD0338 #03 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $949 $875
SD0338 #02 Y:2003 Utilize controls to operate equipment only when needed $1,765 $2,800
SD0338 #01 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $5,938 $280
LE0184 #07 Y:2003 Utilize higher efficiency lamps and/or ballasts $6,017 $30,709
LE0184 #06 Y:2003 Install compressor air intakes in coolest locations $8,355 $1,500
LE0184 #05 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $10,137 $200
LE0184 #04 Y:2003 Utilize energy-efficient belts and other improved mechanisms $11,237 -
LE0184 #03 Y:2003 Chill water to the highest temperature possible $15,203 $2,000
LE0184 #02 Y:2003 Turn off equipment during breaks, reduce operating time $34,434 $10,000
LE0184 #01 Y:2003 Change rate schedules or other changes in utility service $35,446 -
AS0377 #09 Y:2003 Add equipment/ operators to reduce production bottleneck $156,863 $200,000
AS0377 #08 Y:2003 Repair and eliminate steam leaks $2,085 $40
AS0377 #07 Y:2003 Install / repair insulation on steam lines $331 $200
AS0377 #06 Y:2003 Replace existing hvac unit with high efficiency model $193 $344
AS0377 #05 Y:2003 Use most efficient type of electric motors $401 $816