Assessment Year | 2004 |
---|---|
Principal Product | Milk Processing |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 102 |
Plant Area |
18,000
ft2
|
Annual Production | 224,380,000
lb
|
Production Hrs. Annual | 5,304
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $288,618 | 4,901,535 |
kWh
|
$0.059 |
Electricity Demand | $16,375 | 10,183 |
kW-mo/yr
|
$1.61 |
Electricity Fees | $31,679 | - |
|
- |
Natural Gas | $64,404 | 8,570 |
MMBtu
|
$7.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $192,444 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $192,444 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $28,088 | $120 |
$20,227
449,498
kWh
|
$7,861
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,107 | $5,750 |
$702
15,604
kWh
|
$273
-
kW-mo/yr
|
- | $132 | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,140 | $20 |
$1,564
34,754
kWh
|
$576
-
kW-mo/yr
|
- | - | - | |
04 | 2.7314: Reduce ventilation air | $1,236 | $30 |
$890
19,784
kWh
|
$346
-
kW-mo/yr
|
- | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $401 | $816 |
$228
5,059
kWh
|
$173
-
kW-mo/yr
|
- | - | - | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $193 | $344 |
$153
3,395
kWh
|
$40
-
kW-mo/yr
|
- | - | - | |
07 | 2.2136: Install / repair insulation on steam lines | $331 | $200 | - | - |
$331
-
MMBtu
|
- | - | |
08 | 2.2135: Repair and eliminate steam leaks | $2,085 | $40 | - | - |
$2,085
-
MMBtu
|
- | - | |
09 | 4.111: Add equipment/ operators to reduce production bottleneck | $156,863 | $200,000 | - | - | - | - | $156,863 | |
TOTAL RECOMMENDED | $192,444 | $207,320 |
$23,764
528,094
kWh
|
$9,269
-
kW-mo/yr
|
$2,416
-
MMBtu
|
$132 | $156,863 | ||
TOTAL IMPLEMENTED | $192,444 | $207,320 |
$23,764
528,094
kWh
|
$9,269
-
kW-mo/yr
|
$2,416
-
MMBtu
|
$132 | $156,863 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs