ITAC Assessment: OD0093
ITAC logo
ITAC Assessment: OD0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Special Machine Tools
NAICS
n/a
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 187,000
ft2
Annual Production 15
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,623 6,648,007
kWh
Electricity Demand $213,174 27,062
kW-mo/yr
Electricity Fees $69,384 -
Natural Gas $26,249 4,068
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,654 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,990

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,668 $11,164 $1,418
126,612
kWh
$3,250
-
kW-mo/yr
- -
02 2.4224: Upgrade controls on compressors $322 $560 $322
28,429
kWh
- - -
03 3.5112: Reprocess spent oils on site for re-use $1,164 $3,797 - - $1,164
-
MMBtu
-
04 3.5248: Separate and recycle scrap metal to foundry or for sale $2,500 - - - - $2,500
-
lb
TOTAL RECOMMENDED $8,654 $15,521 $1,740
155,041
kWh
$3,250
-
kW-mo/yr
$1,164
-
MMBtu
$2,500
-
lb
TOTAL IMPLEMENTED $4,990 $11,724 $1,740
155,041
kWh
$3,250
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs