ITAC Assessment: SD0338
ITAC logo
ITAC Assessment: SD0338
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Print newspapers
NAICS 511110: Newspaper Publishers
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 70,000
ft2
Annual Production 365
pieces
Production Hrs. Annual 8,372
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $259,632 2,876,627
kWh
Electricity Demand $88,692 5,914
kW-mo/yr
Natural Gas $42,618 7,476
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,133 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,938 $280 $5,938
65,789
kWh
- -
02 2.6231: Utilize controls to operate equipment only when needed $1,765 $2,800 $1,765
19,551
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $949 $875 $949
10,514
kWh
- -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $18,690 $10,000 - $18,690
-
lb
-
05 4.441: Install automatic packing equipment $3,791 $3,500 - - $3,791
TOTAL RECOMMENDED $31,133 $17,455 $8,652
95,854
kWh
$18,690
-
lb
$3,791
TOTAL IMPLEMENTED - - - - -