ITAC Assessment: WV0425
ITAC logo
ITAC Assessment: WV0425
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Lamp Products
NAICS 335121: Residential Electric Lighting Fixture Manufacturing
SIC 3645: Residential Electric Lighting Fixtures
Sales Range $100
M
to 500
M
# of Employees 401
Plant Area 520,000
ft2
Annual Production 500,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $647,790 27,470,798
kWh
Electricity Demand $407,019 47,713
kW-mo/yr
Natural Gas $1,714,379 171,617
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $539,867 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,589

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7243: Improve air circulation with destratification fans / other methods $358,430 $44,500 $(-690.0)
(-28,980)
kWh
$(-350.0)
-
kW-mo/yr
$359,470
-
MMBtu
-
02 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $128,784 $122,980 $(-3,046.0)
(-127,939)
kWh
$(-1,561.0)
-
kW-mo/yr
$138,391
-
MMBtu
$(-5,000.0)
03 2.4224: Upgrade controls on compressors $29,992 $32,300 $21,568
906,225
kWh
$8,424
-
kW-mo/yr
- -
04 2.6231: Utilize controls to operate equipment only when needed $9,251 $9,400 - - $9,251
-
MMBtu
-
05 2.7131: Add area lighting switches $5,883 $20,000 $3,947
165,822
kWh
$1,936
-
kW-mo/yr
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,760 - $3,148
132,143
kWh
$1,612
-
kW-mo/yr
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,578 $3,004 - - $1,578
-
MMBtu
-
08 2.7491: Insulate glazing, walls, ceilings, and roofs $1,189 $4,200 - - $1,189
-
MMBtu
-
TOTAL RECOMMENDED $539,867 $236,384 $24,927
1,047,271
kWh
$10,061
-
kW-mo/yr
$509,879
-
MMBtu
$(-5,000.0)
TOTAL IMPLEMENTED $15,589 $12,404 $3,148
132,143
kWh
$1,612
-
kW-mo/yr
$10,829
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs