ITAC Assessment: OK0633
ITAC logo
ITAC Assessment: OK0633
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Activated Carbon for liquid purification
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 88
Plant Area 152,245
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,906 15,909,838
kWh
Electricity Demand $248,895 26,200
kW-mo/yr
Electricity Fees $1,217 -
Natural Gas $1,147,250 270,183
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,139,769 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $857,118

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,287 $552 $54
2,965
kWh
$39
-
kW-mo/yr
- - $269 $925 -
02 2.7135: Install occupancy sensors $351 $720 $351
19,282
kWh
- - - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,451 $2,995 $375
20,592
kWh
$1,010
-
kW-mo/yr
- - - $66 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $766 $35,173 $1,076
72,770
kWh
$774
-
kW-mo/yr
- - - $(-1,084.0) -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $94,595 $103,140 $55,019
3,023,042
kWh
$39,576
-
kW-mo/yr
- - - - -
06 2.2161: Optimize operation of multi-stage vacuum steam jets $276,478 $200,000 - - $(-214,695.0)
-
MMBtu
$491,173
-
MMBtu
- - -
07 2.2423: Install waste heat boiler to produce steam $752,359 $502,500 - - - $762,104
-
MMBtu
- - $(-9,745.0)
-
Tgal
08 2.7231: Use radiant heater for spot heating $5,822 $11,440 - - $5,822
-
MMBtu
- - - -
09 2.6232: Install set-back timers $6,660 $3,570 - - $6,660
-
MMBtu
- - - -
TOTAL RECOMMENDED $1,139,769 $860,090 $56,875
3,138,651
kWh
$41,399
-
kW-mo/yr
$(-202,213.0)
-
MMBtu
$1,253,277
-
MMBtu
$269 $(-93.0) $(-9,745.0)
-
Tgal
TOTAL IMPLEMENTED $857,118 $647,930 $56,524
3,119,369
kWh
$41,399
-
kW-mo/yr
$6,660
-
MMBtu
$762,104
-
MMBtu
$269 $(-93.0) $(-9,745.0)
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs