Assessment Year | 2009 |
---|---|
Principal Product | Crackers |
NAICS | 311821: Cookie and Cracker Manufacturing |
SIC | 2052: Cookies and Crackers |
Sales Range | $100 M to 500M |
# of Employees | 335 |
Plant Area |
425,000
ft2
|
Annual Production | 131,223,000
lb
|
Production Hrs. Annual | 8,120
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,021,061 | 20,299,422 |
kWh
|
$0.050 |
Electricity Demand | $396,733 | 31,815 |
kW-mo/yr
|
$12.47 |
Electricity Fees | $58,109 | - |
|
- |
Natural Gas | $1,848,970 | 158,610 |
MMBtu
|
$11.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $512,587 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $142,754 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,115 | - | - | - |
$3,115
-
MMBtu
|
|
02 | 2.2212: Use minimum safe oven ventilation | $246,400 | $5,600 | - | - |
$246,400
-
MMBtu
|
|
03 | 2.1133: Adjust burners for efficient operation | $38,729 | $40,000 | - | - |
$38,729
-
MMBtu
|
|
04 | 2.3132: Recharge batteries on during off-peak demand periods | $4,626 | - | - |
$4,626
-
kW-mo/yr
|
- | |
05 | 2.2511: Insulate bare equipment | $98,000 | $244,260 | - | - |
$98,000
-
MMBtu
|
|
06 | 2.2511: Insulate bare equipment | $6,025 | $951 | - | - |
$6,025
-
MMBtu
|
|
07 | 2.4239: Eliminate or reduce compressed air usage | $7,257 | $2,400 |
$5,384
107,040
kWh
|
$1,873
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,345 | $17,129 |
$6,934
137,820
kWh
|
$2,411
-
kW-mo/yr
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,933 | $60,324 |
$11,821
234,935
kWh
|
$4,112
-
kW-mo/yr
|
- | |
10 | 2.7241: Install outside air damper / economizer on hvac unit | $83,157 | $231,450 |
$83,157
1,171,231
kWh
|
- | - | |
TOTAL RECOMMENDED | $512,587 | $602,114 |
$107,296
1,651,026
kWh
|
$13,022
-
kW-mo/yr
|
$392,269
-
MMBtu
|
||
TOTAL IMPLEMENTED | $142,754 | $285,211 | - | - |
$142,754
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs