ITAC Assessment: ST0010
ITAC logo
ITAC Assessment: ST0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product WEB & SHEET FED PRINTING
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area
n/a
Annual Production 1,800,000
lb
Production Hrs. Annual 5,550
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,877 822,098
kWh
Natural Gas $31,239 5,013
MMBtu
Other Energy $4,200 498
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,784 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,077

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Paper Savings Other Energy Savings
01 3.6121: Burn waste paper for heat $17,516 $25,000 - $21,116
-
MMBtu
$(-3,600.0)
-
MMBtu
-
02 2.7221: Lower temperature during the winter season and vice-versa $4,173 - $1,594
16,413
kWh
$2,579
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,071 $429 $4,071
41,911
kWh
- - -
04 2.6121: Reduce hot water temperature to the minimum required $930 - $826
8,499
kWh
$104
-
MMBtu
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $689 $745 $940
9,672
kWh
$(-251.0)
-
MMBtu
- -
06 2.7441: Replace broken windows and/or window sash $1,423 $74 $598
6,155
kWh
$825
-
MMBtu
- -
07 2.8223: Add air shields to trucks to increase fuel mileage $843 $1,680 - - - $843
-
MMBtu
08 2.1123: Install automatic stack damper $1,582 $3,625 - $1,582
-
MMBtu
- -
09 2.4221: Install compressor air intakes in coolest locations $228 $150 $228
2,345
kWh
- - -
10 2.7492: Use proper thickness of insulation on building envelope $177 $100 - $177
-
MMBtu
- -
11 2.1233: Analyze flue gas for proper air/fuel ratio $910 $537 - $910
-
MMBtu
- -
12 2.3191: Use demand controller or load shedder $2,900 $25 $2,900
-
kWh
- - -
13 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $342 $32 $342
3,517
kWh
- - -
TOTAL RECOMMENDED $35,784 $32,397 $11,499
88,512
kWh
$27,042
-
MMBtu
$(-3,600.0)
-
MMBtu
$843
-
MMBtu
TOTAL IMPLEMENTED $12,077 $1,222 $7,659
78,840
kWh
$4,418
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Paper Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs