4,105
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AM0654 #03 Y:2013 | 03 | 2013 | Replace hydraulic / pneumatic equipment with electric equipment | $2,037 | $4,000 | |
| AM0654 #02 Y:2013 | 02 | 2013 | Analyze flue gas for proper air/fuel ratio | $2,950 | $1,320 | |
| AM0654 #01 Y:2013 | 01 | 2013 | Optimize plant power factor | $6,620 | $9,320 | |
| UA0116 #04 Y:2013 | 04 | 2013 | Direct warmest air to combustion intake | $565 | $2,320 | |
| UA0116 #03 Y:2013 | 03 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $9,542 | $11,972 | |
| UA0116 #02 Y:2013 | 02 | 2013 | Utilize energy-efficient belts and other improved mechanisms | $4,062 | $1,560 | |
| UA0116 #01 Y:2013 | 01 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,740 | $5,595 | |
| TT0133 #08 Y:2013 | 08 | 2013 | Clean or color roof to reduce solar load | $42,310 | $281,250 | |
| TT0133 #07 Y:2013 | 07 | 2013 | Utilize higher efficiency lamps and/or ballasts | $125,381 | $357,200 | |
| TT0133 #06 Y:2013 | 06 | 2013 | Establish a predictive maintenance program | $5,112 | $17,178 | |
| TT0133 #05 Y:2013 | 05 | 2013 | Utilize higher efficiency lamps and/or ballasts | $1,060 | $1,065 | |
| TT0133 #04 Y:2013 | 04 | 2013 | Install occupancy sensors | $35,591 | $18,500 | |
| TT0133 #03 Y:2013 | 03 | 2013 | Disconnect ballasts | $235 | - | |
| TT0133 #02 Y:2013 | 02 | 2013 | Recharge batteries on during off-peak demand periods | $8,930 | - | |
| TT0133 #01 Y:2013 | 01 | 2013 | Lower temperature during the winter season and vice-versa | $37,393 | - | |
| NC0509 #11 Y:2013 | 11 | 2013 | Eliminate or reduce compressed air usage | $85 | $105 | |
| NC0509 #10 Y:2013 | 10 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $270 | $100 | |
| NC0509 #09 Y:2013 | 09 | 2013 | Recover waste heat from equipment | $725 | $450 | |
| NC0509 #08 Y:2013 | 08 | 2013 | Reduce the pressure of compressed air to the minimum required | $585 | $50 | |
| NC0509 #07 Y:2013 | 07 | 2013 | Install / repair insulation on steam lines | $792 | $787 |