ITAC Assessment: AM0654
ITAC logo
ITAC Assessment: AM0654
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Ice Cream
NAICS 311520: Ice Cream and Frozen Dessert Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 62,000
ft2
Annual Production 48,000,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,482 1,892,700
kWh
Electricity Demand $82,995 4,961
kW-mo/yr
Electricity Fees $8,208 -
Natural Gas $23,590 3,935
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,193 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,156

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $6,620 $9,320 - $6,620
-
kW-mo/yr
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,950 $1,320 - - $2,950
-
MMBtu
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $2,037 $4,000 $587
15,640
kWh
$1,450
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,492 $3,750 $668
17,800
kWh
$824
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,476 $1,000 $661
17,630
kWh
$815
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $724 $576 $356
9,490
kWh
$368
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $677 $5 $303
8,090
kWh
$374
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $217 $400 $217
5,820
kWh
- -
TOTAL RECOMMENDED $16,193 $20,371 $2,792
74,470
kWh
$10,451
-
kW-mo/yr
$2,950
-
MMBtu
TOTAL IMPLEMENTED $14,156 $16,371 $2,205
58,830
kWh
$9,001
-
kW-mo/yr
$2,950
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs