Assessment Year | 2014 |
---|---|
Principal Product | smokeless tobacco products |
NAICS | 312230: Tobacco Manufacturing |
SIC | 2131: Chewing and Smoking Tobacco and Snuff |
Sales Range | $100 M to 500M |
# of Employees | 185 |
Plant Area |
787,000
ft2
|
Annual Production | 2,335,880
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $983,286 | 17,316,600 |
kWh
|
$0.057 |
Electricity Demand | $344,289 | 35,967 |
kW-mo/yr
|
$9.57 |
Natural Gas | $256,570 | 49,520 |
MMBtu
|
$5.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $256,012 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $255,777 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $37,393 | - |
$25,065
439,625
kWh
|
- |
$12,328
-
MMBtu
|
- | |
02 | 2.3132: Recharge batteries on during off-peak demand periods | $8,930 | - | - |
$8,930
-
kW-mo/yr
|
- | - | |
03 | 2.7122: Disconnect ballasts | $235 | - |
$191
3,363
kWh
|
$44
-
kW-mo/yr
|
- | - | |
04 | 2.7135: Install occupancy sensors | $35,591 | $18,500 |
$35,591
624,471
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,060 | $1,065 |
$540
9,490
kWh
|
$27
-
kW-mo/yr
|
- | $494 | |
06 | 2.4157: Establish a predictive maintenance program | $5,112 | $17,178 |
$538
9,443
kWh
|
$4,574
-
kW-mo/yr
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $125,381 | $357,200 |
$85,058
1,492,260
kWh
|
$40,323
-
kW-mo/yr
|
- | - | |
08 | 2.7425: Clean or color roof to reduce solar load | $42,310 | $281,250 |
$44,422
779,334
kWh
|
$7,125
-
kW-mo/yr
|
$(-9,237.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $256,012 | $675,193 |
$191,405
3,357,986
kWh
|
$61,022
-
kW-mo/yr
|
$3,091
-
MMBtu
|
$494 | ||
TOTAL IMPLEMENTED | $255,777 | $675,193 |
$191,214
3,354,623
kWh
|
$60,978
-
kW-mo/yr
|
$3,091
-
MMBtu
|
$494 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs