Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product smokeless tobacco products
NAICS 312230: Tobacco Manufacturing
SIC 2131: Chewing and Smoking Tobacco and Snuff
Sales Range $100
M
to 500
M
# of Employees 185
Plant Area 787,000
ft2
Annual Production 2,335,880
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $983,286 17,316,600
kWh
Electricity Demand $344,289 35,967
kW-mo/yr
Natural Gas $256,570 49,520
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $256,012 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $255,777

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 2.7221: Lower temperature during the winter season and vice-versa $37,393 - $25,065
439,625
kWh
- $12,328
-
MMBtu
-
02 2.3132: Recharge batteries on during off-peak demand periods $8,930 - - $8,930
-
kW-mo/yr
- -
03 2.7122: Disconnect ballasts $235 - $191
3,363
kWh
$44
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $35,591 $18,500 $35,591
624,471
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,060 $1,065 $540
9,490
kWh
$27
-
kW-mo/yr
- $494
06 2.4157: Establish a predictive maintenance program $5,112 $17,178 $538
9,443
kWh
$4,574
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $125,381 $357,200 $85,058
1,492,260
kWh
$40,323
-
kW-mo/yr
- -
08 2.7425: Clean or color roof to reduce solar load $42,310 $281,250 $44,422
779,334
kWh
$7,125
-
kW-mo/yr
$(-9,237.0)
-
MMBtu
-
TOTAL RECOMMENDED $256,012 $675,193 $191,405
3,357,986
kWh
$61,022
-
kW-mo/yr
$3,091
-
MMBtu
$494
TOTAL IMPLEMENTED $255,777 $675,193 $191,214
3,354,623
kWh
$60,978
-
kW-mo/yr
$3,091
-
MMBtu
$494
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs