Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,223

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0081 #02 Y:1989 Preheat boiler makeup water with waste process heat $3,741 $635
OR0081 #01 Y:1989 Modify refrigeration system to operate at a lower pressure $4,762 $68,000
OK0307 #07 Y:1989 Utilize energy-efficient belts and other improved mechanisms $512 $1,737
OK0307 #06 Y:1989 Utilize higher efficiency lamps and/or ballasts $657 $150
OK0307 #05 Y:1989 Use most efficient type of electric motors $457 $1,519
OK0307 #04 Y:1989 Use or replace with energy efficient substitutes $2,762 $4,115
OK0307 #03 Y:1989 Eliminate leaks in inert gas and compressed air lines/ valves $2,805 -
OK0307 #02 Y:1989 Recover waste heat from equipment $2,963 $1,405
OK0307 #01 Y:1989 Utilize higher efficiency lamps and/or ballasts $5,424 $9,430
OK0306 #08 Y:1989 Install timers and/or thermostats $493 $150
OK0306 #07 Y:1989 Eliminate leaks in inert gas and compressed air lines/ valves $1,419 -
OK0306 #06 Y:1989 Utilize energy-efficient belts and other improved mechanisms $810 $1,300
OK0306 #05 Y:1989 Optimize plant power factor $10,716 $16,250
OK0306 #04 Y:1989 Reschedule plant operations or reduce load to avoid peaks $18,384 -
OK0306 #03 Y:1989 Utilize higher efficiency lamps and/or ballasts $110 $102
OK0306 #02 Y:1989 Utilize higher efficiency lamps and/or ballasts $859 $640
OK0306 #01 Y:1989 Utilize higher efficiency lamps and/or ballasts $14,969 $27,903
OK0305 #05 Y:1989 Utilize higher efficiency lamps and/or ballasts $2,686 $2,782
OK0305 #04 Y:1989 Use plant owned transformers or lease transformers $8,684 $17,000
OK0305 #03 Y:1989 Use adjustable frequency drive or multiple speed motors on existing system $1,336 $3,123