ITAC Assessment: OR0081
ITAC logo
ITAC Assessment: OR0081
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product FRESH TURKEYS
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 13,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,034 5,703,693
kWh
Natural Gas $61,550 15,084
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,050 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,360

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $4,762 $68,000 $4,762
196,952
kWh
- -
02 2.2441: Preheat boiler makeup water with waste process heat $3,741 $635 - $2,954
-
MMBtu
$787
03 2.1233: Analyze flue gas for proper air/fuel ratio $5,720 $10,000 - $5,720
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,690 $1,924 $1,263
37,222
kWh
- $1,427
05 2.4133: Use most efficient type of electric motors $137 $324 $137
4,396
kWh
- -
TOTAL RECOMMENDED $17,050 $80,883 $6,162
238,570
kWh
$8,674
-
MMBtu
$2,214
TOTAL IMPLEMENTED $14,360 $78,959 $4,899
201,348
kWh
$8,674
-
MMBtu
$787