| Assessment Year | 1988 |
|---|---|
| Principal Product | BREAD AND ROLLS |
| NAICS |
n/a
|
| SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
n/a
|
| Annual Production | 30,000,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $147,648 | 2,910,023 |
kWh
|
$0.051 |
| Natural Gas | $104,222 | 23,150 |
MMBtu
|
$4.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,825 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,609 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2531: Re-size charging openings or add movable cover or door | $5,220 | $500 | - |
$5,220
-
MMBtu
|
- | |
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $945 | $500 |
$945
18,757
kWh
|
- | - | |
| 03 | 2.1222: Install turbulators | $602 | $700 | - |
$602
-
MMBtu
|
- | |
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $871 | $500 | - |
$1,071
-
MMBtu
|
$(-200.0) | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $516 | $900 |
$516
10,258
kWh
|
- | - | |
| 06 | 2.2441: Preheat boiler makeup water with waste process heat | $2,105 | $100 | - |
$2,105
-
MMBtu
|
- | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $996 | - |
$996
19,637
kWh
|
- | - | |
| 08 | 2.4133: Use most efficient type of electric motors | $524 | $476 |
$524
10,258
kWh
|
- | - | |
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,185 | - |
$1,185
23,447
kWh
|
- | - | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,861 | $1,315 |
$1,861
36,635
kWh
|
- | - | |
| TOTAL RECOMMENDED | $14,825 | $4,991 |
$6,027
118,992
kWh
|
$8,998
-
MMBtu
|
$(-200.0) | ||
| TOTAL IMPLEMENTED | $8,609 | $4,491 |
$5,031
99,355
kWh
|
$3,778
-
MMBtu
|
$(-200.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs