ITAC Assessment: OK0305
ITAC logo
ITAC Assessment: OK0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product INJECTION PLASTIC PARTS
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 5,500,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,221 3,056,272
kWh
Natural Gas $15,262 4,510
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,517 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,497

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $658 $236 $658
15,240
kWh
02 2.2511: Insulate bare equipment $1,153 $836 $1,153
38,980
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,336 $3,123 $1,336
45,135
kWh
04 2.3511: Use plant owned transformers or lease transformers $8,684 $17,000 $8,684
-
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,686 $2,782 $2,686
82,943
kWh
TOTAL RECOMMENDED $14,517 $23,977 $14,517
182,298
kWh
TOTAL IMPLEMENTED $4,497 $3,854 $4,497
137,163
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs