Assessment Year | 2015 |
---|---|
Principal Product | silica sand, hydrous and anhydrous kaolin clay |
NAICS | 212322: Industrial Sand Mining |
SIC | 1446: Industrial Sand |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
95,519
ft2
|
Annual Production | 218,000
ton
|
Production Hrs. Annual | 7,248
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $755,272 | 13,882,000 |
kWh
|
$0.054 |
Electricity Demand | $196,397 | 30,760 |
kW-mo/yr
|
$6.38 |
Electricity Fees | $2,650 | - |
|
- |
Natural Gas | $1,121,241 | 249,397 |
MMBtu
|
$4.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $268,985 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $203,910 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.7311: Maintain machines to reduce leaks | $149,400 | - | - | - | - | $(-2,100.0) | $151,500 | |
02 | 2.3137: Use power during off-peak periods | $50,930 | - | - |
$51,650
-
kW-mo/yr
|
- | $(-720.0) | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,270 | $18,105 |
$13,390
247,980
kWh
|
$3,880
-
kW-mo/yr
|
- | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $12,480 | $80,350 |
$8,820
163,400
kWh
|
$3,660
-
kW-mo/yr
|
- | - | - | |
05 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $9,615 | $1,000 | - | - |
$9,615
-
MMBtu
|
- | - | |
06 | 2.4314: Use synthetic lubricant | $8,670 | - |
$6,130
113,500
kWh
|
$2,540
-
kW-mo/yr
|
- | - | - | |
07 | 2.6218: Turn off equipment when not in use | $8,500 | $210 |
$6,590
122,000
kWh
|
$1,910
-
kW-mo/yr
|
- | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,645 | $1,200 |
$5,160
95,580
kWh
|
$1,485
-
kW-mo/yr
|
- | - | - | |
09 | 2.7132: Install timers on light switches in little used areas | $3,925 | $1,000 |
$3,160
58,720
kWh
|
$765
-
kW-mo/yr
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,550 | $4,730 |
$1,550
28,700
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $268,985 | $106,595 |
$44,800
829,880
kWh
|
$65,890
-
kW-mo/yr
|
$9,615
-
MMBtu
|
$(-2,820.0) | $151,500 | ||
TOTAL IMPLEMENTED | $203,910 | $100,865 |
$33,960
628,960
kWh
|
$10,935
-
kW-mo/yr
|
$9,615
-
MMBtu
|
$(-2,100.0) | $151,500 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs