Assessment Year | 1990 |
---|---|
Principal Product | SUBSURFACE PUMPS, VALVES |
NAICS |
n/a
|
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 240 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $240,376 | 4,859,320 |
kWh
|
$0.049 |
Natural Gas | $13,270 | 4,359 |
MMBtu
|
$3.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,580 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,068 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,424 | $9,430 |
$3,885
87,046
kWh
|
- | $1,539 | |
02 | 2.2437: Recover waste heat from equipment | $2,963 | $1,405 | - |
$2,963
-
MMBtu
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,805 | - |
$3,005
107,268
kWh
|
- | $(-200.0) | |
04 | 2.4322: Use or replace with energy efficient substitutes | $2,762 | $4,115 | - |
$2,102
-
MMBtu
|
$660 | |
05 | 2.4133: Use most efficient type of electric motors | $457 | $1,519 |
$457
16,413
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $657 | $150 |
$657
14,654
kWh
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $512 | $1,737 |
$512
11,430
kWh
|
- | - | |
TOTAL RECOMMENDED | $15,580 | $18,356 |
$8,516
236,811
kWh
|
$5,065
-
MMBtu
|
$1,999 | ||
TOTAL IMPLEMENTED | $15,068 | $16,619 |
$8,004
225,381
kWh
|
$5,065
-
MMBtu
|
$1,999 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs