ITAC Assessment: OK0307
ITAC logo
ITAC Assessment: OK0307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product SUBSURFACE PUMPS, VALVES
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,250
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $240,376 4,859,320
kWh
Natural Gas $13,270 4,359
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,580 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,068

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,424 $9,430 $3,885
87,046
kWh
- $1,539
02 2.2437: Recover waste heat from equipment $2,963 $1,405 - $2,963
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,805 - $3,005
107,268
kWh
- $(-200.0)
04 2.4322: Use or replace with energy efficient substitutes $2,762 $4,115 - $2,102
-
MMBtu
$660
05 2.4133: Use most efficient type of electric motors $457 $1,519 $457
16,413
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $657 $150 $657
14,654
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $512 $1,737 $512
11,430
kWh
- -
TOTAL RECOMMENDED $15,580 $18,356 $8,516
236,811
kWh
$5,065
-
MMBtu
$1,999
TOTAL IMPLEMENTED $15,068 $16,619 $8,004
225,381
kWh
$5,065
-
MMBtu
$1,999
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs