Assessment Year | 2010 |
---|---|
Principal Product | Salad Dressings |
NAICS | 311941: Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing |
SIC | 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
250,000
ft2
|
Annual Production | 14,000,000
units
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $312,101 | 4,988,460 |
kWh
|
$0.063 |
Electricity Demand | $58,701 | 9,899 |
kW-mo/yr
|
$5.93 |
Natural Gas | $291,375 | 25,476 |
MMBtu
|
$11.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $106,048 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,397 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.4153: Use counter current rinsing to reduce waste water | $40,280 | $8,312 |
$(-140.0)
(-2,234)
kWh
|
$(-47.0)
-
kW-mo/yr
|
$40,006
-
MMBtu
|
- |
$461
-
Tgal
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38,302 | $45,934 |
$33,250
531,495
kWh
|
$5,052
-
kW-mo/yr
|
- | - | - | |
03 | 2.7231: Use radiant heater for spot heating | $8,774 | $26,060 | - | - |
$8,774
-
MMBtu
|
- | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $8,191 | $9,460 | - | - |
$8,191
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,536 | $5,263 |
$2,979
47,615
kWh
|
$557
-
kW-mo/yr
|
- | - | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,764 | $1,000 | - | - |
$2,803
-
MMBtu
|
$(-39.0) | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,926 | $686 |
$1,707
27,282
kWh
|
$219
-
kW-mo/yr
|
- | - | - | |
08 | 2.3132: Recharge batteries on during off-peak demand periods | $1,795 | - | - |
$2,419
-
kW-mo/yr
|
- | $(-624.0) | - | |
09 | 2.2136: Install / repair insulation on steam lines | $480 | $284 | - | - |
$480
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $106,048 | $96,999 |
$37,796
604,158
kWh
|
$8,200
-
kW-mo/yr
|
$60,254
-
MMBtu
|
$(-663.0) |
$461
-
Tgal
|
||
TOTAL IMPLEMENTED | $46,397 | $52,197 |
$36,229
579,110
kWh
|
$8,028
-
kW-mo/yr
|
$2,803
-
MMBtu
|
$(-663.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs