Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,630

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KG0061 #04 Y:1996 Use adjustable frequency drive or multiple speed motors on existing system $988 $3,270
KG0061 #03 Y:1996 Install timers and/or thermostats $3,547 $450
KG0061 #02 Y:1996 Use most efficient type of electric motors $13,385 $26,920
KG0061 #01 Y:1996 Use adjustable frequency drive or multiple speed motors on existing system $55,998 $50
DS0053 #05 Y:1996 Increase amount of condensate returned $32,826 $17,550
DS0053 #04 Y:1996 Use adjustable frequency drive or multiple speed motors on existing system $16,379 $48,780
DS0053 #03 Y:1996 Minimize water usage $113,670 $1,000
DS0053 #02 Y:1996 Use most efficient type of electric motors $10,065 $48,791
DS0053 #01 Y:1996 Utilize higher efficiency lamps and/or ballasts $5,015 $17,930
OK0499 #07 Y:1996 Install equipment (eg compactor) to reduce disposal costs $420 -
OK0499 #06 Y:1996 Install set-back timers $308 $156
OK0499 #05 Y:1996 Install occupancy sensors $100 $160
OK0499 #03 Y:1996 Analyze flue gas for proper air/fuel ratio $3,084 $5,000
OK0499 #02 Y:1996 Insulate bare equipment $1,262 $2,915
OK0499 #01 Y:1996 Utilize higher efficiency lamps and/or ballasts $4,063 $1,976
BD0059 #08 Y:1996 Use minimum cooling water to bearings $684 $425
BD0059 #07 Y:1996 Contract a wood pallet recycling company $9,618 $370
BD0059 #06 Y:1996 Train operators for maximum operating efficiency $26,027 $7,500
BD0059 #05 Y:1996 Install compressor air intakes in coolest locations $543 $750
BD0059 #04 Y:1996 Install occupancy sensors $1,101 $825